Home > News >

20TPH Dry Mortar Production Line with Sand Drying Production Line was Shipped to Russia

Pubdate:2025-09-19

From September 12, 2025 to September 18, 2025. CORINMAC's 20TPH(ton per hour) dry mortar production line with sand drying production line was successfully loaded and shipped to Russia.
 
The whole set of dry mortar production line with sand drying production line equipment including wet sand hopper, belt feeder, belt conveyor, three-circuit rotary dryer, burning chamber, burner, draught fan, cyclone dust collector, impulse bags dust collector, vibrating screen, bucket elevator, ton bag packing machine, ton bag un-loader, screw conveyor, weighing hopper, additives weighing and batching system, pneumatic sending tank, 4 cubic single shaft hydraulic mixer, finished product hopper, automatic bag placer for packing machine, automatic packing machine, dust collecting press conveyor, inkjet printer, automatic palletizing robot, automatic pallet feeder, empty pallet automatic film cover, pallet wrapper, control cabinet, steel structure, air compressor and spare parts, etc.
 
Container loading photos are as follows:

Related news

CORINMAC 15TPH Dry Mortar Production Line Successfully Delivered to The UAE

From November 9 to 10, 2026, CORINMAC complete set of 15tph(ton per hour) dry mortar production line with 20tph sand drying production line equipment was successfully loaded into containers and delivered to the UAE.

26/11/11

CORINMAC Cement Packing Machine Successfully Shipped to Mexico

On October 27, 2026, CORINMAC's cement packing machine has been successfully loaded into a container and shipped to Mexico. The completion of container loading marks another concrete step in the company’s continued development of its overseas market

26/10/28