Home > News >

10-15TPH Sand Screening Production Line was Shipped to Chile

Pubdate:2025-11-03

On October 17, 2025, CORINMAC's 10-15TPH(ton per hour) sand screening production line was successfully loaded and shipped to our customer in Chile.
 
The whole set of sand screening production line equipment including wet sand hopper, belt feeder, belt conveyor, vibrating screen, impulse bags dust collector, control cabinet, and spare parts, etc.
 
Wet sand hopper: Used to receive and store the wet sand to be dried.
Belt feeder: Evenly feeding the wet sand into the sand dryer.
Belt conveyor: Transports the dried sand to the vibrating screen.
Vibrating screen: Adopts steel frame screen, the screen operates at an inclination angle of 5°.
Impulse dust collector: Dust removal equipment in the drying line. Ensuring that it meets the environmental protection requirements.
Control cabinet: Used to control the entire screening production line.
 
Container loading photos are as follows:

Related news

CORINMAC Dry Mortar Valve Bag Packing and Palletizing Line has Been Successfully Put Into Operation in Russia

Recently, the dry mortar valve bag packing and palletizing line, customized and manufactured by CORINMAC, officially commenced stable operation at a customer's factory in Russia. Across thousands of miles, the high-quality automated powder packaging a

26/08/25

CORINMAC Automatic Stretch Hooder Successfully Delivered to Kazakhstan

On August 21, 2026, CORINMAC's automatic stretch hooder has been successfully passed factory inspection and delivered to Kazakhstan. This delivery marks another significant milestone in our expanding international footprint. From initial blueprint

26/08/24