Home > News >

5TPH Dry Mortar Production Line was Delivered to Yemen

Pubdate:2025-12-31

On December 30, 2025. CORINMAC's 5TPH(ton per hour) dry mortar production line was successfully loaded and delivered to Yemen.
 
The whole set of 5TPH dry mortar production line equipment including screw conveyor, ton bag un-loader, weighing hopper, manual feeder for chemical additives, single shaft paddle mixer, steel structure, finished product hopper, pulse bag dust collector, impeller packing machine for valve bag, vibrating screen, PLC control cabinet, air compressor and spare parts, etc.
 
To ensure the safety of cross-border transportation, the technical team paid attention to every detail: core components were packaged with custom moisture-proof and rust-proof packaging, high-strength reinforcement solutions were used for container loading, and multilingual operation manuals and remote after-sales support were provided to ensure that the equipment could be put into production quickly upon arrival.
 
Container loading photos are as follows:

Related news

CORINMAC Dry Mortar Valve Bag Packing and Palletizing Line has Been Successfully Put Into Operation in Russia

Recently, the dry mortar valve bag packing and palletizing line, customized and manufactured by CORINMAC, officially commenced stable operation at a customer's factory in Russia. Across thousands of miles, the high-quality automated powder packaging a

26/08/25

CORINMAC Automatic Stretch Hooder Successfully Delivered to Kazakhstan

On August 21, 2026, CORINMAC's automatic stretch hooder has been successfully passed factory inspection and delivered to Kazakhstan. This delivery marks another significant milestone in our expanding international footprint. From initial blueprint

26/08/24