A small production line to Kazakhstan, capacity 3-5tph

Pubdate:2018-09-28

A small production line to Kazakhstan, producing 3-5 tons per hour.

Equipment List
No. Equipment name Model Qty. Power (kw)
1 Bag-breaking machine P-500 2sets 0,55
2 Screw conveyor LSY219х6м 2sets 3
3 Weighing warehouse 1М3 1set --
4 Screw conveyor LH-1 1set 5.5
5 Main steel frame --- 1set --
6 Finished product warehouse 2 m³ 1set ---
7 Packing machine F-JX-01 1set 3
8 Control cabinet -- 1set --
9 Screw conveyor LSY219х3.6м 1set 3
 

Related news

CORINMAC Open Top Bag Packaging Machine was Shipped to Spain

On June 7, 2026. CORINMAC customized open top bag packaging machine for the Spain project completed the overall debugging, precision calibration, factory quality inspection, and international shipping standard protective packaging. It was officially s

26/06/08

CORINMAC 5TPH Dry Mortar Production Line was Shipped to Madagascar

On June 1, 2026. CORINMAC complete set of 5TPH(ton per hour) dry mortar production line with sand drying production line completed overall debugging, factory quality inspection, moisture-proof and shock-proof packaging, and was successfully loaded int

26/06/04