Home > News >

30-35 tons per hour sand drying production line was delivered to Novosibirsk, Russia.

Pubdate:2025-04-01

On April 19, 2024, CORINMAC one set of drying equipment was delivered to Novosibirsk, Russia.

This is the second time the customer has ordered our sand drying production line. 
 
The capacity of the first set was 15-20 tons per hour, which can not meet the customer's production needs. This time we provide customers with a dryer with cylinder diameter of 2.9 meters and cylinder length of 5.8 meters. The capacity can reach 30-35 tons per hour. 
 
Because of the cold winter in Novosibirsk, we have added insulation layers to the dryer cylinder and pulse dust collector according to the local climate conditions to ensure that the dryer does not lose heat, and the pulse dust collector does not condense water and block the filter bags.











Related news

Automatic Packing and Palletizing Line was Delivered to Uzbekistan

On December 9, 2025. CORINMAC's automatic packing and palletizing line equipment was successfully loaded and delivered to Uzbekistan. The whole set of automatic packing and palletizing line equipment including automatic bag placer for packing machi

25/12/10

Dry Mortar Production Equipment was Shipped to Kyrgyzstan

On December 6, 2025. CORINMAC's customized dry mortar production equipment has been successfully loaded and shipped to Kyrgyzstan. Dry mortar production equipment shipped this time including ton bag un-loader, screw conveyor, 1.5 cubic meter weigh

25/12/08